Showing posts with label WIP. Show all posts
Showing posts with label WIP. Show all posts

Friday, November 04, 2011

Totally Manic

P1000399

There's a short circuit in my brain somewhere. I normally consider the idea of knitting a blanket ludicrous... I mean, why spend all that time and money on a large, worsted weight item that is never going to be finished anyway?

Somehow, though, knitting a blanket in tiny squares of sock yarn seemed totally reasonable.

And I'm making two.

Above, you see the "colorwash" blankie (so called for the group that fuels my madness: BlankieMania) as it stood a couple of months ago; it hasn't changed much, since I motivate myself to work on it afresh by disallowing myself to work on it the moment I feel ennui or have something else I should be doing. I was inspired by this one, choosing each new square color by matching it to the two squares it grows out of. (There is no seaming in this project: I pick up stitches from the squares below, and ends are woven in as I go.)

The other one is random, with a black border between each square, to give the eyes a break. It's still in the too-small-to-photograph stage.

Uh, yeah, and my other blanket project (that's right, blanket #3) is also garter stitch, knit on the bias out of handspun Romney (this is why it's obvious there's an error in my wiring).

Tuesday, June 21, 2011

Will She Make It?!



I'm nearly done with the body ribbing for Cecilia, and I feel as though my goal of having this cardi done in time for Black Sheep is within my grasp.

However, I still have the elbow-length sleeves and the collar/button band to knit. It's Tuesday, and I've got until Saturday to do it in, but we're already on vacation, and vacationing must happen!

I understand that we will be missing The Imaginary Invalid in Ashland, since the Bowmer (sp?) Theater has some structural problem or other. I was more excited about the Molière than the Shakespeare (Measure For Measure)!

If I can manage to knit a sleeve a day (we'll pretend the button band takes as much time as a sleeve), and I don't have to drive, or do anything else much, I'll have a finished sweater in time for BSG (and it will have taken me two weeks)!